We chose green because Joe's preference (Barbi pink) was unavailable.
These pictures are before the 14' overhead door was installed. The height will let Joe back the truck into the building for the occasional welding repair. As mentioned before, air drying will occur under the lean-to section and dry lumber for sale will be inside the building.
Electrical work is being installed over the next few days and Joe and I are focussed on getting EVERYTHING OUT of our old building and off that lot. Moving IN has not really started yet.
No comments:
Post a Comment